Labor of love

After a lengthy search up and down country roads Gregg and I bought the land for our studio+shop in 2008. We sat on it for two years before we broke ground in 2010. This was a dream project that took us approximately five years to complete. We started with getting Gregg’s wood shop finished so he could gradually build out the rest of the space. We enjoyed the slower pace taking time to ensure the layout worked for our creative needs and invested in the materials and design details that were most important to us. We made a commitment to using quality materials, timeless design and utilizing local resources as much as possible.